|          |               |     +A     -A     |    
空氣質素健康指數
20 March 2020 (Fri) 09:00:00
旺角
路邊監測站
空氣質素健康指數
20 March 2020 (Fri) 09:00:00
旺角
路邊監測站
Redevelopment of Kwai Chung Hospital, Phase 1

AEC was appointed to provide acoustics design and assessment in support of BEAM Plus certification for the hospital development.

 

Located in the Kwai Tsing district of Hong Kong, a 4-storey ancillary building is designed and constructed. The consultancy services cover sound insulation design, architectural room acoustic design, MEP services noise and vibration control, environmental noise control for plant and equipment close to noise sensitive receivers, and testing & commissioning including various deliverables such as shop drawings and submission review, site inspection reports, as well as acoustic T&C report at both construction and T&C stages.

 

Projects & Services
Privacy Policy |  Disclaimer |  Site Map |  Web Accessibility Conformance Statements

Copyright © Allied Sustainability and Environmental Consultants Group Limited.

Powered by Backroom Creative Limited.